happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
P3281945.JPG
28 March 2009View of the junction of the yellow pvc to the raceway from several outlets and switch boxespklongball00000
(0 votes)
P3261936.JPG
26 March 2009A general view looking to the bedroom door and two of the team discussing what beer they will drink with dinner tonight. One of the wall crew is up on the scaffolding working a wall that will be the back of the store roompklongball00000
(0 votes)
P3261937.JPG
26 March 2009From this angle we can get a glimpse of one of the carpenters who handles the forms for the window openings. This is one in the guest bedroom being readiedpklongball00000
(0 votes)
P3261938.JPG
26 March 2009Another day and more of the roof tile is completed. Almost finished nowpklongball00000
(0 votes)
P3261939.JPG
26 March 2009And now it's time for the door frames. This one is being set in for the kitchen door to the back patiopklongball00000
(0 votes)
P3261929.JPG
26 March 2009And here we have a section that is ready for the cables. 4 conduits were bent using a heat gun,,,yes I said heat gun not lighter or some sort of fire on a stick, then attached to holes cut into the bottom of the channel. And the use of the connector and bushings is another requirementpklongball00000
(0 votes)
P3261934.JPG
26 March 2009A shot here of the now installed raceway but before the conduit is connected to the bottom of the channel with bushings.pklongball00000
(0 votes)
P3261931.JPG
26 March 2009And again some arrows point to another section of raceway and the method to hang it. Some holes are drilled into the steel of the roof and they secure it with big "pop" rivets. This will make his cabling job a breezepklongball00000
(0 votes)
P3261930.JPG
26 March 2009In this shot I am pointing some added arrows to the now installed wireway. Sparky is doing a fine job to this point in how he is going about the install of my wiring.pklongball00000
(0 votes)
P3261926.JPG
26 March 2009So we come to the panel with no cover and no breakers installed. This is a 3 phase panel in case anyone is wonderingpklongball00000
(0 votes)
P3261927.JPG
26 March 2009Another view of the panel with door off and you can see the spot for the main breaker and 24 MCB'spklongball00000
(0 votes)
P3261928.JPG
26 March 2009Our new Square "D" Classic load centerpklongball00000
(0 votes)
7141 files on 596 page(s) 528

Debug Info 
Debug Output: show / hide