001.JPG
Site preparationPi Lek, confident, doesn't know yet what's ahead of him for the next few monthsthomas.fontaine00000
(0 votes)
0002.jpg
Roof plan viewthomas.fontaine00000
(0 votes)
0001.jpg
Plan viewthomas.fontaine00000
(0 votes)
img108.jpg
Front viewthomas.fontaine00000
(0 votes)
P4041993.JPG
4 AprilFrom the right front corner we can see a hip area that needs the cap tiles and this will just about complete the tile work. A few more in the areas close to the bottom of the two big gables and then the gable work and the roof will be finished.pklongball00000
(0 votes)
P4041994.JPG
4 AprilAnd from the back right corner we can see gables that need finishing and the master bedroom door opening and the back verandapklongball00000
(0 votes)
P4041995.JPG
4 AprilThis shot of one of the valley areas of the roof. Nice job on all the valleys and I would have expected this as I have seen this man's work on other builds my builder has donepklongball00000
(0 votes)
P4041990.JPG
4 AprilAnd now the back left corner view showing us the long roof valley that was done very well in my opinion. The tile fitter spent a lot of time cutting the tile to get a good tight, straight line down this valley.pklongball00000
(0 votes)
P4041991.JPG
4 AprilFrom the left front view we can see the roof gable is the next finish that needs to be done.pklongball00000
(0 votes)
P4041992.JPG
4 AprilIn this view from the driveway entry we can get a heads on view of the now 99% finished tile.pklongball00000
(0 votes)
P4011977.JPG
1 AprilLay brickie working her way up another interior wall. Not too much more block and the walls will be uppklongball00000
(0 votes)
P4011978.JPG
1 AprilLiving room widow rough opening with the first coat of cement on it.pklongball00000
(0 votes)