Starting the Roof PanelsAlthough you can't see it in this picture, we used standard 50x150 composite panels, but had them cut in half (75cm length) to give them a better look (more like the smaller concrete roof tiles). Since the labor contract was fixed-price, our only extra cost in doing this was that we needed twice as many fastener hooks. No extra steel was required.DrDave (0 votes)
|
|
Day #1 - Foundation LayoutOn the first day of construction, the house footprint was located on the land from some rough markings my wife and I had placed before we returned to Phuket two days earlier. All of the land under the floor beams, as well as the holes for the column footings was hand-dug.DrDave (0 votes)
|
|
Column BasePouring the concrete for the first column footing.DrDave (0 votes)
|
|
Column BaseThe columns (sowpoons) are set in about 30cm of concrete.DrDave (0 votes)
|
|
Setting the Forms for the Ground BeamsDrDave (0 votes)
|
|
21 AprilThis is the view most visitors to the area will see when coming from the main entry of the projectpklongball (0 votes)
|
|
21 AprilBack view of the place as of todaypklongball (0 votes)
|
|
21 AprilNow some work has started on the back veranda stairway. A base layer of concrete was poured today.pklongball (0 votes)
|
|
21 AprilHere we have a gable now with all the Sherawood applied. The yellow color is the Shera unfinished out of the box color. We will paint it and the trim wood will get finish too.pklongball (0 votes)
|
|
|
|
|