|
Top rated |
Day #25 - Exterior Walls CompletedDrDave (0 votes)
|
|
Rear ViewRear of the house. The door leads into the kitchen. There's a 1.5 meter patio outside the kitchen, and eventually, we'll install a 1,000L water tank and pump between the door and the bedroom window to the right.DrDave (0 votes)
|
|
Front PorchHalf-wall at the front of the porch. DrDave (0 votes)
|
|
SuperstructureView of the entire house, from the front. At the front is the covered porch - 2 meters deep by 8 meters wide. You can't see it in this picture, but there's a separate roof over this area, dropped down and recessed into the main roof by about 50cm.DrDave (0 votes)
|
|
Floor SlabPouring the floor slab in the kitchenDrDave (0 votes)
|
|
Floor SlabPouring the floor slab in the kitchen.DrDave (0 votes)
|
|
Roof StructureA clear view of the steel roof structure from the inside, after the composite panels are in place.DrDave (0 votes)
|
|
Interior WallsThe interior walls are going up. At the front is the wall separating the living room from the front bedroom, while the wall at the back separates the kitchen from the back bedroom.DrDave (0 votes)
|
|
Day #15 - Roof StructureApparently, the family forgot to take pictures the previous week, so now we jump ahead to all of the columns having been poured, and the majority of the steel roof structure fabricated, painted and put in place.DrDave (0 votes)
|
|
Exterior WallsThe exterior walls are going up. I would have preferred to use larger block, or maybe even QCON block, but my wife insisted on using red brick. Incidentally, we found that not all local red brick was the same size.DrDave (0 votes)
|
|
Cement MixerAll the concrete and mortar for the project was mixed onsite with this gas-powered mixer (provided by the builder).DrDave (0 votes)
|
|
Roof Structure & PanelsHere you can see the steel structure with the first of the panels installed.DrDave (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
515 | |
|
|
|
|
|
|
|