2 MayA view looking along the back wall and the partly buried drain pipes and boxes.pklongball (0 votes)
2 MayA view from the back looking at the now partially complete back veranda steps. Should look good whn he's done and the tile and sandwash are in place.pklongball (0 votes)
2 MayWe see the stair man working on the second of 3 steps up/down from the back veranda. pklongball (0 votes)
29 AprilMore of the pipes as they come to the yet to be installed sewer pipe.pklongball (0 votes)
29 AprilAs the pipes exit the opening going to the septic and drain pipes. PLEASE NOTE THE U_TRAP NEAR THE OPENING! There are two of these on the shower floor/sink drain lines from each bath roompklongball (0 votes)
29 AprilNow a view from the crawl space opening and we can see the finished rough in for the bath pipingpklongball (0 votes)
29 AprilHere we have the stairman working on the back veranda stairway. First was a concrete pad. Now the first course of brick to build the first step.pklongball (0 votes)
29 AprilThe sewer drain trench along one side of the land.pklongball (0 votes)
29 AprilGuest bath rough-in for the sink and location of the water heater.pklongball (0 votes)
29 AprilHere we see the one added personal touch we have in the master bath. We will have 2 sets of mixer valves. The one to the right in the photo is a normal mixer valve location with a rain shower head and hand held sprayer. The 2nd one on the left is another mixer and hand-held location down lower on the side wall and near where a sit down bench will be built. This will be nice for those days when you really want to scrub the feet or when I get too old to stand under the rain head. pklongball (0 votes)
29 AprilMaster bath plumbing is now roughed-in. Minimal pipes in the floorpklongball (0 votes)
29 AprilMore ceiling grid in preparation for the sheetrockpklongball (0 votes)