happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
P5082182.JPG
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony. We have Mrs PK and the delivery man checking the quantity and type of tile delivered. She has been a great manager for our team.pklongball00000
(0 votes)
P5082183.JPG
8 MayToday we had a delivery of the tile for the main bath, main floors and front balcony.pklongball00000
(0 votes)
P5082184.JPG
8 MayHere is a new thing. Wife decided she wanted a recessed area in the wall above the bed headboard to put items such as books, flowers , knick-knacks or whatever. So we had the crew saw cut out the area and this will be finished off in some nice way.pklongball00000
(0 votes)
P5052172.JPG
5 MayA view looking at the living room ceiling area and gridwork and some drywall.pklongball00000
(0 votes)
P5052173.JPG
5 MayThe septic tank is now half buried and the newly dug trench from the street comes to the drain box. I need to get them to be sure that no water from any drain line in the house can drain to the back of the land so some sort of blocking will have to be placed in the pipe thats heads and slopes to the back.pklongball00000
(0 votes)
P5052174.JPG
5 MayToday they finished the second trench down the side from the septic tank to the street drain. I hope tomorrow the pipe will be installed.pklongball00000
(0 votes)
P5052167.JPG
5 MayAnother view from under the veranda ceilingpklongball00000
(0 votes)
P5052168.JPG
5 MayMore of the ceiling work around the back veranda areapklongball00000
(0 votes)
P5052169.JPG
5 MayMore of the ceiling work around the back veranda areapklongball00000
(0 votes)
P5052170.JPG
5 MayHere we have some of the completed work around the exterior soffits or eaves. Later we will add some ventilation ports.pklongball00000
(0 votes)
P5052171.JPG
5 MayView of the kitchen ceiling gridpklongball00000
(0 votes)
P5052162.JPG
5 MayHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball00000
(0 votes)
7141 files on 596 page(s) 510

Debug Info 
Debug Output: show / hide