happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
P6282540.JPG
June 28The wood crew is finishing the wood fascia boards before the tile applicationpklongball00000
(0 votes)
P6282541.JPG
June 28Dirt man and Mrs talking over what we want done.pklongball00000
(0 votes)
P6282542.JPG
June 28We decided we needed a driveway and parking space even though the budget will not allow a covered car park. So we brought in a JCB for an hour or so to dig out about 15 cm of dirt in the shape we decided. He piled up the good dirt where it will get spread around and used. The excess and the junk piles we had him load in to a truck and haul off.pklongball00000
(0 votes)
P6282533.jpg
June 28Guest bath as seen from the inside and the new window. Very functional and cleanpklongball00000
(0 votes)
P6282534.jpg
June 28Guest bedroom as seen now with the new windows in place and looking goodpklongball00000
(0 votes)
P6282535.JPG
June 28The Bedroom/Bathroom side of the house now complete with the casement windowspklongball00000
(0 votes)
P6282536.JPG
June 28The master bath double window. The window guys did a nice clean install.pklongball00000
(0 votes)
P6282537.JPG
June 28Outside view of guest bath window now installed and readypklongball00000
(0 votes)
P6282528.JPG
June 28The roof is almost ready for the tilepklongball00000
(0 votes)
P6282529.JPG
June 28The kitchen door now installed with handle/lock and the double key lock dead bolt as this window has glass panes and needs the extra securitypklongball00000
(0 votes)
P6282530.JPG
June 28The double casement window we decided on for the kitchen window. This one may have been a poor choice but time living in the place will really answer this question.pklongball00000
(0 votes)
P6282531.jpg
June 28One of the 4 casement windows in the bedrooms. Two left swing and two right swing. Double handle locks on each window.pklongball00000
(0 votes)
7141 files on 596 page(s) 487

Debug Info 
Debug Output: show / hide