happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
sloping.JPG
wall 5Then it fell over. One night of rain was enough. This wall will be rebuilt using correct engineering and correct drainage. Another 40 trucks of dirt will be needed to top up the infill that was washed away. Probable total cost: around 250,000 baht.jazzman00000
(0 votes)
fallen_1.jpg
wall 4Wet dirt is a viscous mass far heavier even than the water in a swimming pool, and exerts even more pressure on the surrounding walls.
A rogue bnuilder charged about 180,000 baht for this wall.
1 commentsjazzman00000
(0 votes)
fallen_2.jpg
wall 3If a perimeter wall is to be used for retaining fill dirt, it needs some careful consideration. This wall is (was) 100 x 20 for 1 metre of in-fill.
Think about the 20 cm thick, steel reinforced walls of your tiny 4 x 8 swimming pool...
jazzman00000
(0 votes)
fallen_4.JPG
wall 2It's not just for keeping thieves out, and your kids, rabbits, and dogs in either.jazzman00000
(0 votes)
fallen_5.jpg
Wall 1A perimeter wall might not just be for decoration.jazzman00000
(0 votes)
external_render_work_5.jpg
Let the render Commence......changnoi00000
(0 votes)
external_render_work_2.jpg
Let the render Commence......changnoi00000
(0 votes)
external_render_work_4.jpg
Rendering the Right Hand Rear Wallchangnoi00000
(0 votes)
external_render_work_7.jpg
Rendering the Left Hand Rear Wallchangnoi00000
(0 votes)
driveway_complete.jpg
Front view of completed drivewaychangnoi00000
(0 votes)
cement_for_rendering.jpg
Cement for Renderingchangnoi00000
(0 votes)
DS_Loo_door_in.jpg
Downstairs Loo Door InJust a left hand divider wall to go changnoi00000
(0 votes)
7141 files on 596 page(s) 458

Debug Info 
Debug Output: show / hide