P1272807.JPG
Jan.27,2010Backed in to the exact spotpklongball00000
(0 votes)
P1272808.JPG
Jan.27,2010Once in place then the set up of the rig beginspklongball00000
(0 votes)
P1282811.JPG
Jan.28,2010The crew came back in the morning of day 2 to begin the drilling. It will take one day to drill down about 20 meters or so into the soft dirt, sand and gravel.pklongball00000
(0 votes)
Upstairs_Hallway_Being_Rendered.jpg
Upstairs Hallway being renderedchangnoi00000
(0 votes)
Master_Ensuite_Being_External_Rendered.jpg
External Rendering of Master Ensuitechangnoi00000
(0 votes)
meshing_and_ducting.jpg
Using Mesh with walls and columnschangnoi00000
(0 votes)
more_use_of_meshing.jpg
Using Mesh with walls and columnschangnoi00000
(0 votes)
outside_bedroom_3.jpg
Rendering outside bedroom 3 on deckchangnoi00000
(0 votes)
Stairway_Being_Rendered.jpg
Rendering in Stairwaychangnoi00000
(0 votes)
Bedroom_2_Being_Rendered.jpg
Rendering in Bedroom 2changnoi00000
(0 votes)
Bedroom_3_Being_Rendered.jpg
Rendering in Bedroom 3changnoi00000
(0 votes)
Bedroom_3_Being_Rendered_2.jpg
Rendering in Bedroom 3changnoi00000
(0 votes)