heavy escavatorthe soil man needed to bring in a "big macro" to take out some stubborn tree stumps.Max&Bee-in-CM00000
(0 votes)
IMG_2926.JPG
drilling the holethe hole was drilled to 60 metres, at a cost of 36,000 baht.
it took about 3 days start to finish for the job.
Max&Bee-in-CM00000
(0 votes)
IMG_2784.JPG
more soilMax&Bee-in-CM00000
(0 votes)
IMG_2789.JPG
trying to level it outthe leveling out was ok, but not as smooth as it could have been.Max&Bee-in-CM00000
(0 votes)
IMG_2802.JPG
dumping soileach truck costs 350 baht, but we ordered 1.5 rai to a height of 50 cm, for a total cost of 70,000 baht.Max&Bee-in-CM00000
(0 votes)
IMG_2805.JPG
levelling the soilthe soil was compacted by 20 cm, we had wanted 50 cm but after the tractor was done, it ended up being 30 cm or so.Max&Bee-in-CM00000
(0 votes)
IMG_3941.JPG
looking along the main roadthe fence posts were removed by the seller of the landMax&Bee-in-CM00000
(0 votes)
IMG_3951.JPG
land looking towards the intersectionawesome color of the riceMax&Bee-in-CM00000
(0 votes)
IMG_3952.JPG
Cow not includedLand looking along the main roadMax&Bee-in-CM00000
(0 votes)
IMG_2725.JPG
Electricity PoleFirst thing is we need power, so the electricity truck installs a pole. (cost = 3000 B)Max&Bee-in-CM00000
(0 votes)
P4300051.jpg
Cable "Work"21 commentsnorbo00000
(0 votes)
P4300059.jpg
Cable "Work"norbo00000
(0 votes)