happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_4114.JPG
The metal ladyThe local very friendly and helpful metal shop lady. Total cost to cut 3 metal plates (30 cm X 30 cm), and the long bolts and 20 nuts was 1360 baht.Max&Bee-in-CM00000
(0 votes)
IMG_4121.JPG
Making boltsCutting the bolts to size - 20 cm for the bolts that will go into the concrete to hold metal plates, and 15 cm bolts to connect the metal plates together.Max&Bee-in-CM00000
(0 votes)
IMG_4177.JPG
Rebar frame and pipesTaking shapeMax&Bee-in-CM00000
(0 votes)
IMG_4198.JPG
Building the rebar frameA fame 3 metre high is build for the telescope pierMax&Bee-in-CM00000
(0 votes)
IMG_3976.JPG
DeliveryThe concrete pipes are delivered to site. No cost for delivery.Max&Bee-in-CM00000
(0 votes)
IMG_4020.JPG
Measure inside diameterThe inside diameter of the concrete pipes are measured in order to build a rebar cage of the appropriate size.Max&Bee-in-CM00000
(0 votes)
IMG_4023.JPG
Rebar in pipesMeasure out the size to make sure the rebar squares fit tight.Max&Bee-in-CM00000
(0 votes)
IMG_4107.JPG
Metal platesAfter a few hours of searching, a metal shop that had the appropriate steel was found.Max&Bee-in-CM00000
(0 votes)
IMG_3715.JPG
Water zoneThe water pump area has been setup, with the smurf installed 60 metre below ground,
and some pipes and container.
Max&Bee-in-CM00000
(0 votes)
IMG_3719.JPG
Switch for the SmurfA simple switch is setup for the smurf (submersible pump).Max&Bee-in-CM00000
(0 votes)
IMG_3722.JPG
Running powerElectricity poles on the land are quickly setup to run power to the different work zonesMax&Bee-in-CM00000
(0 votes)
IMG_3565.JPG
First delivery of rebarThe truck finally arrivesMax&Bee-in-CM00000
(0 votes)
7141 files on 596 page(s) 442

Debug Info 
Debug Output: show / hide