|
| Top rated |
|
|
|
|
|

Roof frame and tilerucus7     (0 votes)
|
|

Foundation of pier1 cubic metre of concrete was poured into the foundation, the rebar cage was set, and the first concrete pipe as lowered into position. By next morning is was all dry. Max&Bee-in-CM     (0 votes)
|
|

Drill moldThe wooden board for the drill holes.Max&Bee-in-CM     (0 votes)
|
|

Metal platesThe metal plates in the back of the car, looking for a drill shop now. Need to drill 3 plates.Max&Bee-in-CM     (0 votes)
|
|

Bottom part of pier doneThe concrete pour went smoothly. Its as solid as a concrete pier.Max&Bee-in-CM     (0 votes)
|
|

Hole #1The hole is dug for the telescope pier.Max&Bee-in-CM     (0 votes)
|
|

Hole #1 closedThe soil people mistakenly dumped soil and closed the hole dug for the pier.Max&Bee-in-CM     (0 votes)
|
|

Hole #2The second hole is dug out by hand, size is 1 m cubed.Max&Bee-in-CM     (0 votes)
|
|
| 7142 files on 596 page(s) |
 |
 |
 |
 |
 |
441 |  |
 |
 |
 |
|

|
|
|