|
Top rated |
Wet soilRainy season has started, so the new soil is muddy and slippery.Max&Bee-in-CM (0 votes)
|
|
Foundation holesThey made a rock/soil mold for the concrete pour at the bottom of the hole.Max&Bee-in-CM (0 votes)
|
|
the Thai family areasmak dab across field is big Aunty hse, up horizontal road by 3 houses is MTW family & all around r cuz's. So lots of SadiKa's between Aunty hse & the site. Sized based on Auntys' but went to two floors so room space about same but leaves some area to park, keep chickens, barbque, and maybe garden. Sized by tile count at 1/3 m per tile. Story goes Aunty wanted this plot but owner no sell at that time.otis-a (0 votes)
|
|
RocksThr rock pile that is used to line the bottom of the foundation holesMax&Bee-in-CM (0 votes)
|
|
Macro hard at workTrying to finish off all the holes. Max&Bee-in-CM (0 votes)
|
|
|
|
the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-a (0 votes)
|
|
footing hole going down all in!normal steel cement const. chaing raiotis-a (0 votes)
|
|
column formsnormal steel cement const. chaing raiotis-a (0 votes)
|
|
q/c team make steel inspectionnormal steel cement const. chaing raiotis-a (0 votes)
|
|
beams going innormal steel cement const. chaing raiotis-a (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
436 | |
|
|
|
|
|
|
|