happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_4471.JPG
More soilWe told the soil man he is not getting paid until I see 50cm straight and level across the whole property - he had another 120+ trucks delivered.Max&Bee-in-CM00000
(0 votes)
IMG_4472.JPG
Metal shutteringReady for assemblyMax&Bee-in-CM00000
(0 votes)
IMG_4474.JPG
Metal shutteringWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CM00000
(0 votes)
IMG_4483.JPG
Concrete poured for foundationsMax&Bee-in-CM00000
(0 votes)
IMG_4429.JPG
PPS concrete truckThe truck from the local companyMax&Bee-in-CM00000
(0 votes)
IMG_4432.JPG
Watch out belowThe worker directs the flowMax&Bee-in-CM00000
(0 votes)
IMG_4434.JPG
Levelling the concreteThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CM00000
(0 votes)
IMG_4435.JPG
Supporting the columnsWooden frames are used to support the columnsMax&Bee-in-CM00000
(0 votes)
IMG_4437.JPG
Carying another column rebarMax&Bee-in-CM00000
(0 votes)
IMG_4419.JPG
Columns positionedThe rebar columns are positioned for the concrete pour.Max&Bee-in-CM00000
(0 votes)
IMG_4420.JPG
Concrete truckWe used a local company called PPS, concrete was excellent quality, and the service quick and stress free.Max&Bee-in-CM00000
(0 votes)
IMG_4421.JPG
Pouring concrete for foundationsThe truck brought 15 cubic metres of concrete for the footings. Cost = 1,480 baht per cube, with a total cost of 22,2000 baht for the first pour.Max&Bee-in-CM00000
(0 votes)
7141 files on 596 page(s) 434

Debug Info 
Debug Output: show / hide