|
Top rated |
All columns doneAll the foundations and columns have been poured and are drying.Max&Bee-in-CM (0 votes)
|
|
DryingConcrete has been poured for foundations and columns, and is drying now.Max&Bee-in-CM (0 votes)
|
|
Inside the rebar columnLooking down inside the rebar and the concrete column.Max&Bee-in-CM (0 votes)
|
|
Soil colorsThe original soil is brown, and the infill soil is more yellow. Max&Bee-in-CM (0 votes)
|
|
Making wooden stakesFor hunting vampires in the moo-bahnMax&Bee-in-CM (0 votes)
|
|
|
Metal shuttering for the columnsThe workers are sorting the shuttering delivered to site.Max&Bee-in-CM (0 votes)
|
|
|
Column shutteringFixing the shuttering for the columns before concrete pour into the top.Max&Bee-in-CM (0 votes)
|
|
Masked workerThe mystery worker works on the column shutteringMax&Bee-in-CM (0 votes)
|
|
|
|
7141 files on 596 page(s) |
|
|
|
|
|
433 | |
|
|
|
|
|
|
|