|
Top rated |
Front right boundary pegThis is the front right of the land, with the hole dug for the fence post. The electricity pole will be placed inside the fence.Max&Bee-in-CM (0 votes)
|
|
Bamboo fenceWe have chosen a bamboo fence. It is 3 m long and 2.5 m high. We have also ordered one that will not have gaps between the bamboo bars, hence have more privacy. Cost of each unit = 300 baht.Max&Bee-in-CM (0 votes)
|
|
Fence postsThese are the fence posts chosen, height is 3 m. Cost is 180 baht each. They are reinforced with 4 rebar, and have attachments for barbed wire.Max&Bee-in-CM (0 votes)
|
|
Front let boundary markerThis is the front of the land chanote tin-din boundary marker. The fence line has been marked from here to the rear.Max&Bee-in-CM (0 votes)
|
|
Back left boundary markerShown is the chanote tin-din land boundary marker located at the rear left of the land. A concrete post will be built, which will be significantly stronger than the purchased posts, to reinforce the fence.Max&Bee-in-CM (0 votes)
|
|
One of the post holesThe holes have been dug to a depth of 70 cm, the concrete posts are 3 m high.Max&Bee-in-CM (0 votes)
|
|
Holes along the backHoles for the fence posts have been dug along the back of the propertyMax&Bee-in-CM (0 votes)
|
|
Backfill in progressOur macro man is doing the backfillMax&Bee-in-CM (0 votes)
|
|
|
Backfill almost doneWe may need some soil trucks to finish the backfillMax&Bee-in-CM (0 votes)
|
|
Lots of waterThe front of the land got flooded, this shows clearly where the depressions in the land are.Max&Bee-in-CM (0 votes)
|
|
Foundations floodedHave to wait until it dries to continueMax&Bee-in-CM (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
431 | |
|
|
|
|
|
|
|