|
Top rated |
View of column form-moldsThe front view of the houseMax&Bee-in-CM (0 votes)
|
|
Closeup of column moldsThe concrete has been poured and the columns are top heavyMax&Bee-in-CM (0 votes)
|
|
Column form-molds completeLooking at the rear of the houseMax&Bee-in-CM (0 votes)
|
|
Wire tiesI found the simple frame and wire tires were much quicker to build and hold the posts than the old frame i started with, dont know why I didnt do the simple option first.Max&Bee-in-CM (0 votes)
|
|
Levellingthe level thing is my second favorite tool, even the Thai workers at site started using it more often.Max&Bee-in-CM (0 votes)
|
|
Working into the nightSo much cooler to work into the evening, but the mosquitoes start to bite at nightMax&Bee-in-CM (0 votes)
|
|
RainbowA rainbow appears over the first few postsMax&Bee-in-CM (0 votes)
|
|
Hammering the stakesSome are easy to hammer into the ground, others are not.Max&Bee-in-CM (0 votes)
|
|
Waiting for sunsetSitting on the ground beam form-molds waiting for the sunsetMax&Bee-in-CM (0 votes)
|
|
Support for the beamLots of wood is used for support.Max&Bee-in-CM (0 votes)
|
|
First beam moldThe first beam form-mold they installed.Max&Bee-in-CM (0 votes)
|
|
Form molds for ground beamsMost have been completed and are waiting for concreteMax&Bee-in-CM (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
420 | |
|
|
|
|
|
|
|