|
Top rated |
First postI was quite happy to get it straight and levelMax&Bee-in-CM (1 votes)
|
|
|
Cutting the support framesHelping out a lot.Max&Bee-in-CM (1 votes)
|
|
|
|
Concrete floor for the bathroomThey put down some concrete to give a better floor for the outdoor bathroom. Fresh water is pumped up from 60 metres.Max&Bee-in-CM (1 votes)
|
|
Measure land infill heightUsing a water tube, the height of the soil infill is measured. It should be 50 cm, but it was found to vary between 25 and 40 cm. Hence the soil man was told to fill to the agreed level of 50 cm, and not beat around the bush, by saying the land is uneven in places. Payment is being withheld until 50 cm is achieved on the whole land.
The agreement was verbal - next time everything will be in writing - lesson learnt - don't trust anyone.Max&Bee-in-CM (1 votes)
|
|
Surpervising the projectWe are at site daily to supervise the work.Max&Bee-in-CM (1 votes)
|
|
Bending the rebarThe lady bends the rebar while her 2 daughters look on.Max&Bee-in-CM (1 votes)
|
|
Efficient workerOur best worker on site, small but really really fast.Max&Bee-in-CM (1 votes)
|
|
|
Digging foundation holesThe macro man hard at work.Max&Bee-in-CM (1 votes)
|
|
7141 files on 596 page(s) |
|
|
4 | |
|
|
|
|
|
|
|
|
|
|