happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSCF4961.JPG
The waste from the downstairs toilet will be collected in this tank formed from precast concrete rings - this one is 4 rings deep.chiyman00000
(0 votes)
DSCF4972.JPG
Ground floor slab completed - the part nearest the concrete mixer will be brushed once it has semi cured.chiyman00000
(0 votes)
DSCF4970.JPG
Everything ready for pouring the Ground floor slabchiyman00000
(0 votes)
DSCF4969.JPG
Note the reinfocement for the ground floor slab (mesh) was tied onto the ground beam reinforcement for extra strength.chiyman00000
(0 votes)
DSCF4968.JPG
placing pegs in the ground as a depth guide for the ground floor slabchiyman00000
(0 votes)
DSCF4966.JPG
Materials for construction of the column formworkchiyman00000
(0 votes)
DSCF4983.JPG
Pouring concrete into the column formwork - a highly manual process - effective though!!chiyman00000
(0 votes)
DSCF4978.JPG
A delivery of Yucca poles freshly cut which will be used later for the first floor constructionchiyman00000
(0 votes)
DSCF4975.JPG
Further ground floor to first floor column formwork constructionchiyman00000
(0 votes)
DSCF4974.JPG
Ground floor slab completed. starting to build the formwork for the Ground floor to first floor columnschiyman00000
(0 votes)
DSCF4973.JPG
Completed Ground slab brushed finish ready to accept floor tiling later onchiyman00000
(0 votes)
DSCF4992.JPG
Piles of Sand and stone for concrete mixingI should have insisted that a wooden structure be constructed to hold the sand and stone as just dumping it on the ground and using it caused a lot of wastage and required a big clean up later on. chiyman00000
(0 votes)
7141 files on 596 page(s) 390

Debug Info 
Debug Output: show / hide