happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSCF5026.JPG
Pre cast concrete slabs used to form the first floor being deliveredchiyman00000
(0 votes)
DSCF5040.JPG
A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.chiyman00000
(0 votes)
DSCF5039.JPG
Precast Slabs placed and formwork ready for pouring 50mm cover of concretechiyman00000
(0 votes)
DSCF5038.JPG
Placing the first floor pre cast slabs, removal of first floor beam formwork and placement of first floor slab mesh reinforcement.chiyman00000
(0 votes)
DSCF5037.JPG
Precast slabs in place forming the first floor - note the hole left is for the stairwell.chiyman00000
(0 votes)
DSCF5031.JPG
Lifting the precast ploor slabs into position on the first floor beams
chiyman00000
(0 votes)
DSCF5045.JPG
Roofing material and steel in the background.chiyman00000
(0 votes)
DSCF5044.JPG
First Floor Beams completed - formwork will be removed once the concrete has properly cured.chiyman00000
(0 votes)
DSCF5043.JPG
Completed First floor beams - awiting removal of formwork once the concrete has cured.chiyman00000
(0 votes)
DSCF5042.JPG
The larger white dog was in fact a male. I think the puppy was hungry. The dog then urinated on the puppy!! which made the construction worker owner rather cross!chiyman00000
(0 votes)
DSCF5041.JPG
Placing the steel reinforing mesh on the first floor precast slabschiyman00000
(0 votes)
DSCF4955.JPG
An evening meal washed down with plenty of Thai whisky at the end of a hard days work.chiyman00000