The skeleton of the de-mountable air-conditioned site office being erected.Ians00000
(0 votes)
P1090727.jpg
The whole builing has been has been setout with "string-lines" (actually fishing line) to ensure all footings etc are in the correct location.Ians00000
(0 votes)
Overview_project_complete.JPG
Overview of projectMaseratimartin00000
(0 votes)
SANY0578.JPG
Perimeter wall beam20x30cm concrete beam with 4 x 4hun rebar....

After seeing it in real....I think we overdo it...but that's ok!

Maseratimartin00000
(0 votes)
SANY0583.JPG
Perimeter wallFooting holes digged through our fruit tree garden...Maseratimartin00000
(0 votes)
SANY0587.JPG
PreparationsAlways thinking of the next step and keeping people busy.
Here I clean up for measuring of the future pool/guest house.
Maseratimartin00000
(0 votes)
SANY0553.JPG
SupervisorMy two ladies always keeping an eye on that things go right....Maseratimartin00000
(0 votes)
SANY0554.JPG
Perimeter wall holesAfter we cleaned up the wooden fence of our neighbour...sitting about 0.5m on our side....the footing holes are being digged...1 commentsMaseratimartin00000
(0 votes)
SANY0564.JPG
Perimeter wall trainingMaseratimartin00000
(0 votes)
SANY0565.JPG
Perimeter wall construction trainingWith all the knowledge from our forum I personally advice the troups how to do the perimeter wall correct...ha ha!Maseratimartin00000
(0 votes)
SANY0576.JPG
Garage footing holesThe footing holes 1x1x1m for the garage are digged.
I want the garage done asap to get a clean place to rest in the shadow...and to have a dry place for materials!
Size of Garage 6.5x6.5m with 2.25x5m opening...20cm load bearing wall on 15cm slab with 50x20cm foundation (6x 4hun rebar)
Maseratimartin00000
(0 votes)
SANY0588.JPG
Stainless gatesA local shop with nice gate designs....Maseratimartin00000