|
Top rated |
Guest Bedroom wood floor, first lookShastadad (0 votes)
|
|
Master Bedroom wood floor first lookShastadad (0 votes)
|
|
First major screw upconsultant was told that he would be receiving center border and upper border. He took this to mean that upper border was to be placed on top of center border and told same to worker Shastadad (0 votes)
|
|
Here the tiler is removing all tiles above the borderThis guy is almost as good at tearing down his work as he is doing it the first time. Not one piece was broken during removalShastadad (0 votes)
|
|
|
|
first look master bath wall tilemajor screw up on my part. Ordered tile on 50 / 50 basis even though white tile will be required to cover more areaShastadad (0 votes)
|
|
Kanyong initially gave me grief about return and replace (two week rule) but backed down when they realized that their special order material delayed the start of workShastadad (0 votes)
|
|
|
|
first look 1/2 bath floor tileShastadad (0 votes)
|
|
first look guest 1/2 bath wallShastadad (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
340 | |
|
|
|
|
|
|
|