happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_1611.jpg
Burying the PVC PipeThe PVC pipe will is being buried under where the driveway will be poured. The PVC pipe is a space holder for the HDPE underground electric conduit. dozer00000
(0 votes)
IMG_1609.jpg
Good Thing Electrician Stopped ByThis PVC will be positioned in the driveway so the underground electric conduit can later be run under the driveway in the opening provided.dozer00000
(0 votes)
IMG_2199.jpg
Column EdgingThe columns are edged showing their outline, here pictured in a wall that has been rendered but yet to be painted.dozer00000
(0 votes)
IMG_2191.jpg
Rendering with SpongeA sponge is used to get the final finish on the wall.dozer00000
(0 votes)
IMG_2190.jpg
Brooming the WallThe brooming is used as the final step to get the finish on the wall.dozer00000
(0 votes)
IMG_2095.jpg
Wood TrowelThe wood trowel is used after the straightedge tool to start getting a smooth finish.dozer00000
(0 votes)
IMG_2094.jpg
Straight EdgeThe straight edge tool is used on the rough wall as the first step after the render has been applied.dozer00000
(0 votes)
IMG_2084.jpg
Cornering The ColumnThe straight edge is used to create the square corner on the column. dozer00000
(0 votes)
IMG_2076.jpg
Squaring a BeamThe window opening is squared using a straight edge tool. dozer00000
(0 votes)
IMG_2068.jpg
Wire Mesh Applied to CornerWire mesh is affixed to corner areas prior to rendering to prevent cracking. dozer00000
(0 votes)
IMG_2067.jpg
Wire MeshClose up of wire mesh which is affixed using a nail and washer. It is used near the corner to keep cracking and separation problems to a minimum. dozer00000
(0 votes)
IMG_2062.jpg
Wire Mesh After Corner AddedThe wire mesh partially embedded in render after the corner has been squared. dozer00000
(0 votes)
7141 files on 596 page(s) 325

Debug Info 
Debug Output: show / hide