|
Top rated |
Affixing ScreenAffixing a piece of metal screen to the aluminum ceiling frame. dozer (0 votes)
|
|
Cutting Smart BoardThe smart board comes in sheets and is cut to size as needed. dozer (0 votes)
|
|
Aluminum Rail FrameworkInstalling the rail framework. The rails are run to form sections to support the smart board ceiling sections. The suspended framework is supported by aluminum strips affixed to the roof structure. dozer (0 votes)
|
|
Exterior Ceiling FrameInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer (0 votes)
|
|
Setting in the Cross SupportsSetting the cross supports into place for the exterior ceiling.dozer (0 votes)
|
|
Taping a JointTaping a joint on the interior ceiling. The joints are taped, plastered and sanded for a smooth finish. dozer (0 votes)
|
|
Plastering after TapeThe taped joints are plastered and then later sanded. The screw heads are plastered as seen with the white spots. dozer (0 votes)
|
|
Service EntryThe prefab service entries (Chang Brand) are more expensive than just doing one up out of spare drywall sheeting but they are more durable and after using them prefer them to just the home made versions. They are two pieces, frame and opening and come in various sizes, this one the openings are 60 x 60.dozer (0 votes)
|
|
Ceiling after PlasterThe interior ceiling after taping and plastering prior to finishing sanding. dozer (0 votes)
|
|
Installing Service EntryInstalling the service entry. BTW it wasn't the installer that recommended these, think they are seldom used but they certainly are worth the few extra baht. dozer (0 votes)
|
|
Drywall Piece InstallationA piece of drywall sheeting is installed. We used Chang brand and water resistant in the bathrooms. dozer (0 votes)
|
|
Drywall SheetingA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
315 | |
|
|
|
|
|
|
|