IMG_2336.jpg
Formwork for Sink and StoveThe areas formed off are for the stove top and sink as they will not be poured. dozer00000
(0 votes)
IMG_2334.jpg
Rebar for ConcreteThe rebar is laid out for the concrete top pour. The poured sub counter will be used to support a granite counter top. dozer00000
(0 votes)
IMG_2327.jpg
Cabinet WallsThe supporting walls for the counter are placed according to the design of where the lower doors will go. dozer00000
(0 votes)
IMG_2325.jpg
Outer SupportThe cabinet structure is made of red brick. The structure will support a U shaped counter. The outside frame will help support the weight of counter.dozer00000
(0 votes)
IMG_2684.jpg
Tile WashingThe tiles are always prepared by immersion in fresh water prior to being laid. dozer00000
(0 votes)
DSCN0362.jpg
Finished Granito TilesA finished section of granito floor tiles.dozer00000
(0 votes)
DSCN0360.jpg
Finished Bathroom SectionA finished section of the bathroom wall tiles.dozer00000
(0 votes)
DSCN0359.jpg
Kitchen Trim TransitionThe kitchen wall tiles transition to the wood trim. dozer00000
(0 votes)
DSCN0357.jpg
Glass TilesThe glass tiles under the installed cabinets.dozer00000
(0 votes)
DSCN0354.jpg
Aluminum TrimOn the driveway we used aluminum trim edging.dozer00000
(0 votes)
DSCN0352.jpg
Bezen Tiles PatioThe patio tiles have held up well so far. dozer00000
(0 votes)
DSCN0350.jpg
Bezen Tiles DrivewayThe driveway tiles.dozer00000
(0 votes)