Welding Lower BeamWelding the lower beam in place. dozer00000
(0 votes)
IMG_2122.jpg
Affixing Side BeamThe side metal beams were affixed to the wall with anchor bolts. dozer00000
(0 votes)
IMG_2118.jpg
Metal Divider on FloorThe finished tiles will be above the seam making a slight step into the room. The beam is anchor bolted to the floor. dozer00000
(0 votes)
IMG_2112.jpg
Top MeshThe top mesh is used to prevent access via the roof, the metal bars are just welded one on top of another (this area will be above the ceiling not will not be seen). dozer00000
(0 votes)
IMG_2075.jpg
Working on Top MeshThe top metal mesh work is additionally welded to the roof structure for support. dozer00000
(0 votes)
IMG_1963.jpg
Walls ReinforcedThe walls are reinforced with 6mm rebar meshing. Here the rebar is anchored in the ring beam. dozer00000
(0 votes)
IMG_1950.jpg
Double WallThe double wall has a layer of poured re enforced concrete in the middle. dozer00000
(0 votes)
DSCN0505.jpg
Sliding Aluminum WindowThere are three tracks, one for the screen (inside) and two for the window sections. dozer00000
(0 votes)
DSCN0474.jpg
Shower EnclosureThe shower enclosure glass and handle. The glass is 10 mm safety glass with stainless handles and fittings done by the aluminum window factory. dozer00000
(0 votes)
IMG_3541.jpg
Side Door FitThe doors fit nicely in the frames.dozer00000
(0 votes)
IMG_3540.jpg
Adjusting the OpeningHere the door opening is being adjusted. dozer00000
(0 votes)
IMG_2759.jpg
Door PaintingOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozer00000