happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_2740.jpg
Large Melann Sandstone EngravingThese come in either 1 pc (as this one) or 3 pcs. We chose the single piece which weighs 75kg. dozer00000
(0 votes)
IMG_2720.jpg
Decorative Standstone CarvingsThe small decorative sandstone 30 cm tiles (each under 200 baht) were placed in various locations on the wall. dozer00000
(0 votes)
IMG_2718.jpg
Affixing Sandtone TilesThe sandstone tiles are fitted up near the wood trim. dozer00000
(0 votes)
IMG_2715.jpg
Rendered SurfaceThe rendered surface with a pencil line where the sandstone engraving will be placed. The surface was rendered by the tiler to ensure true surfaces.dozer00000
(0 votes)
DSCN0470.jpg
Lower StepThe lower step and transition to tile. One length of steel tubing is above ground and one is half under the tile level.dozer00000
(0 votes)
DSCN0471.jpg
Upper TransitionThe upper length of structural steel tubing is used as a transition into the ceiling. dozer00000
(0 votes)
IMG_2566.jpg
Finished Secured Metal PartitionThe completed metal partition with door. dozer00000
(0 votes)
IMG_2528.jpg
Rear WindowThe secured rear opening. dozer00000
(0 votes)
IMG_2179.jpg
Attaching the Guide BarAttaching the guide bar to be used in fitting in the last row of cross members. dozer00000
(0 votes)
IMG_2178.jpg
Guide BarDuring the welding process a guide bar was used so that the cross members would be welding into place straight. dozer00000
(0 votes)
IMG_2177.jpg
Partial DoorThe beginning of the door and lower panel. dozer00000
(0 votes)
IMG_2158.jpg
Guide LinesEstablishing a guide line for the cross supports. dozer00000
(0 votes)
7141 files on 596 page(s) 307

Debug Info 
Debug Output: show / hide