happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSCN0343.jpg
Completed WallThe completed wall with large sandstone engraving and small sandstone feature tiles.dozer00000
(0 votes)
DSCN0342_edited-1.jpg
The other Wall dozer00000
(0 votes)
DSCN0341.jpg
Finish at Wood TrimThe tiler did a nice job finishing off the upper tile row next to the wood trim.dozer00000
(0 votes)
DSCN0340.jpg
Finish at adjacent WallThe corner was just painted to blend from the untiled wall to the tiled wall.dozer00000
(0 votes)
IMG_2783.jpg
Nearing CompletionThe engraving in place and most of the tiling complete. Notice the randomly placed square sandstone tiles and the finish where the tiles meet the wood trim. dozer00000
(0 votes)
IMG_2767.jpg
Partially Finished WallThe wall with the engraving in place and the lower portion of the sandstone tiling complete.dozer00000
(0 votes)
IMG_2760.jpg
Lifting Mural into PlaceLifting the engraving into place. dozer00000
(0 votes)
IMG_2755.jpg
Prep Back of MuralThe adhesive is applied to the back of the engraving. dozer00000
(0 votes)
IMG_2752.jpg
Weber Tile AdhesiveThe weber tile adhesive is applied to prep the surface for the engraving.dozer00000
(0 votes)
IMG_2748.jpg
Lower Section TiledPreparing for placing the mural, the lower section has been tiled and next the sandstone engraving will be lifted into place.dozer00000
(0 votes)
IMG_2743.jpg
Engraving FrameThe prepared frame for where the 75 kg. engraving will be placed.dozer00000
(0 votes)
IMG_2741.jpg
Preparing Engraving FrameThe wall was indented in order to have a frame to support the large sandstone engraving. dozer00000
(0 votes)
7141 files on 596 page(s) 306

Debug Info 
Debug Output: show / hide