|
Top rated |
MountingThis shows a corner column with the initial hardware mounted for the door. In the front on either side is a 50cm wall that the roll up door will sit behind. This 'false' helps the transition from the exterior of the building to the roll up door and is often used. dozer (0 votes)
|
|
Installing the Outer CasingThe outer casing is just a shell to hide the inner workings of the roll up door. The door rolls up into this casing. This is located on the upper inside. dozer (0 votes)
|
|
Finished CasingThe finished mechanism casing. The covering panels are riveted into place.dozer (0 votes)
|
|
Bunk Bed Bolt AttachmentsThe brackets which allow the bunk bed to be assembled/disassembled with bolts. dozer (0 votes)
|
|
Security MetalThe welder used guides to ensure the spacing between the vertical bars was consistent. The long 1 by 1 is used as a horizontal guide. The work turned out very straight. dozer (0 votes)
|
|
HeadboardPainting a head board just welded with the foot board visible behind it. dozer (0 votes)
|
|
Shelving for StorageOK, not actually anything welded, but they did cut, assemble and put together several sets of shelving. dozer (0 votes)
|
|
Metal Roof on Storage ShedThis metal roof was welded on this storage shed after the old corrugated roofing became problematic. dozer (0 votes)
|
|
Storage CabinetsWelded together several of these storage cabinets with the exterior being metal mesh. The design using mesh allows stuff to be hung on from the mesh with U hooks. dozer (0 votes)
|
|
Storage CabinetThe frame of the cabinet prior to attaching the wood shelving and latches. dozer (0 votes)
|
|
Working on a GateFabricating one panel for a gate. dozer (0 votes)
|
|
Security MetalWelding security metal in place. dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
302 | |
|
|
|
|
|
|
|