|
Top rated |

Ground Beam Rebar FrameThe rebar framework to support the ground beam.
dozer     (1 votes)
|
|

External From Front LeftThe roof is a 28% angle. This particular house will be 84 square meters inside, although it looks bigger.dozer     (1 votes)
|
|

Upper Strap ConnectionThe aluminum strap attaches to the tile batten or the roof structure. These strap type attachers are always better than wire. dozer     (1 votes)
|
|

Edge Tiles ReplacedThe edge tiles are replaced here without excess space between the tile edge and the fascia board. dozer     (1 votes)
|
|

Junction BoxA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer     (1 votes)
|
|

Home Pro standard window/door brochure.thailazer     (1 votes)
|
|

Building Area View 9Land to be filledSuper8man     (1 votes)
|
|

Finishing the first floor slab concretechiyman     (1 votes)
|
|
|
|

Roof tile work resumes now that the metal is almost finishedMax&Bee-in-CM     (1 votes)
|
|
|
7141 files on 596 page(s) |
 |
3 |  |
 |
 |
 |
 |
 |
 |
 |
|

|
|
|