|
Top rated |
Rough Surface ApplicationThe surface is roughed after drying slightly in preparation for tile application. dozer (0 votes)
|
|
Roughed SurfaceHere is a roughed surface. A bamboo broom or a handful of wire (the same wire used to tie the rebar together) is used to rough the surface.dozer (0 votes)
|
|
Steel SpecificationSteel is sold as light, medium, full or industrial (?¹‚?¸£?¸§?¹??¸«?¸??¹?) which is a confusing system. The actual specification which refers to the strength required to deform 1 mm strand is printed on the side of the rebar, in this case SD30, on this 12 mm rebar. Only the full grade was used on all 6, 9 and 12mm throughout the project.dozer (0 votes)
|
|
Column Frame MeshThe column footing frame is 90 centimeters wide (square) and includes a top and bottom lattice. The lower frame is composed of 9mm rebar with the column frame composed of 12mm rough with 6mm connectors. dozer (0 votes)
|
|
Column Frame MeshAnother view of the footing and column framework with a 1.5 liter water bottle for size reference. dozer (0 votes)
|
|
Column HolesThe holes measure 1 meter wide and 40 centimeters deep. dozer (0 votes)
|
|
Frame on SpacersThe footing frame sits on spacers to ensure it sits equidistant within the footing. dozer (0 votes)
|
|
Ground Beam Diagonal MemberThe ground beam contains a fifth strand of 12mm rebar which runs in up and down diagonal fashion to increase strength. dozer (0 votes)
|
|
Cinderblocks Form WorkThe cinder blocks are used as form work for the entire ground beam. The cinder blocks will remain after the pour and become part of the flooring material and the exterior walkway. dozer (0 votes)
|
|
Red Brick SpacersRed brick can also be used as spacers (alternatively from the concrete spacers with wire ties) as needed. These are used to center the ground beam framework equidistant within the cinder block form work. dozer (0 votes)
|
|
CompactorThe ground within the ground beam is new dirt which has been brought in, due to the fact that the floor level of the house will be higher than the original ground level. It is first watered and allowed to settle naturally. Then a compactor is used for further compression prior to the pouring of the floor.dozer (0 votes)
|
|
Project Fly ThroughA fly through done as a baseline comparison between the finished project and the initial design. Also interesting to note how furniture and other amenities can be added to the house. Click Detail for you tube URLdozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
276 | |
|
|
|
|
|
|
|