Laying Aerated BlockAerated blocks are not mortared in a convention sense. They are basically glued together (using the designated product) and kept secure by tying them into the columns with 6mm rebar which has been drilled into the column. A groove is cut in the block to hold the rebar in place. dozer (0 votes)
|
|
Keeping the Structure WetSlow drying concrete has the best strength characteristics and will develop structural cracks less often. Here water is being sprayed to the top of the columns to ensure slow, smooth drying. dozer (0 votes)
|
|
Ring BeamA ring beam is run horizontally around the entire structure below the window openings. Here we see the beam frame work in place. dozer (0 votes)
|
|
Ring Beam Form WorkThe form work for the horizontal ring beam is made of plywood. Notice 9mm rebar strips are used to ensure that the form work doesn't deform during the pour. dozer (0 votes)
|
|
Floor Structure with Damp CourseThe floor rebar is spaced at 20 centimeter intervals and red bricks are used as spacers. The damp course material is a heavy thick black plastic which is hard to find. It is more durable and resistant to tearing. The normal clear plastic is problematic and should be avoided. Of course, any damp course is better than no damp course!dozer (0 votes)
|
|
Concrete Samples for Compressive TestThe floor and foundation are poured using CPAC 280 steng (which equates to 280 ksc or 280 kilograms per square centimeter of compressive stregth). The slump is 12 - 14 centimeters which is on the dry side for extra strength. The samples will be further analyzed at the factory and a report certification sent. dozer (0 votes)
|
|
Floor + Ground Beam PourThe concrete being poured also has a water proofer as a double protective factor to ensure the damp course. The ground beams and floor is being poured. The floor pour is 10 - 12 centimeters. dozer (0 votes)
|
|
Slump TestHere is the slump test being performed by a CPAC QA engineer. If the slump is 12 to 14 centimeters the concrete is dryish, 15-17 the concrete is normal and 18 + the concrete is watery. Although 12 to 14 is a bit harder to work it is a stronger and more desirable product to be used in the flooring and ground beam. Workers often prefer 18 + as it is easier to work, without regard to the strength characteristics of the concrete. dozer (0 votes)
|
|
Floor LevelThe ultimate target floor level is indicated by the prepoured concrete cone in the middle of the picture. Once the CPAC is poured this provides a reference for the leveling process. Note that the finished poured floor is not exactly level, the ultimate leveling occurs during the laying of the ceramic floor tiles. dozer (0 votes)
|
|
Concrete being AppliedThe concrete is delivered from the truck to the desired spot via our 30 centimeter PVC half pieces. This works better than other delivery systems and avoids extra cost required for special equipment. dozer (0 votes)
|
|
Vibrator avoids Voids in the ConcreteA vibrator is necessary to avoid voids in the final product. When the vibrator is applied to the concrete you will see the area around the vibration compact and sink quickly. dozer (0 votes)
|
|
Freshly Poured FloorThe poured and leveled floor. dozer (0 votes)
|
|