happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_9586.jpg
Ceiling in KitchenThe ceiling in the kitchen after the installation of the trim wood.dozer00000
(0 votes)
IMG_9609.jpg
Gate Being WeldedThe gate being welded. dozer00000
(0 votes)
IMG_9622.jpg
Level LineA long clear plastic tubing is used to create a level line which will be used to set the top level for the floor tiles. The tube is filled with water, on one end a line is marked at the water line. At a different area perhaps several meters away another mark is made (in is a two man process). This two independent marks will be at the same level and measurement can be made from this point downwards to determine the target level for the tiles. dozer00000
(0 votes)
IMG_9385.jpg
Kitchen PaintingThe kitchen being painted. The paint used was super shield (both primer and the finish coat). The kitchen and bathroom are semi gloss (washable) while the rest of the house are done in matte. dozer00000
(0 votes)
IMG_9397.jpg
Counter Prep for GraniteThe counter is being prepped for laying in the granite slabs. dozer00000
(0 votes)
IMG_9402.jpg
Slab put in PlaceHere the granite slab is set into place. The holes and edges are cut at the stone factory. The sinks were used by the factory to guarantee a perfect opening for the under mount sinks. The faucet holes will be drilled on site.dozer00000
(0 votes)
IMG_9412.jpg
Faucet HolesThe faucet holes are drilled on site by the granite people. A special bit is used and water is poured during the during the drilling process to avoid having the granite surface crack. dozer00000
(0 votes)
IMG_9425.jpg
Painting Door TrimThe door frame being painted. The sides are properly masked prior to painting. dozer00000
(0 votes)
IMG_9440.jpg
Wood Trim being AppliedWood trim being applied to the corner section of the tiered ceiling. Glue is applied to the underside of the trim prior to nailing in place via an air gun. dozer00000
(0 votes)
IMG_9441.jpg
Wall Tiles AppliedThe lower row of tiles is supported by concrete nails. This level is where the floor tiles will be after they are laid. Spacers are used to ensure consistent spacing. The surface is roughed prior to laying the tiles.dozer00000
(0 votes)
IMG_9445.jpg
Joint RepairThe joints are puttied to make so the wood looks as if it were one piece. The joints are miter cut to fit together at a 45 degree angle.dozer00000
(0 votes)
IMG_9449.jpg
PuttyThe fill putty is colored using the urethane as applied to the original wood trim to achieve a matching color. dozer00000
(0 votes)
7141 files on 596 page(s) 263

Debug Info 
Debug Output: show / hide