happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
IMG_1807.JPG
11/23/2006 13:32An unvarnished cabinet door.1 commentstcth00000
(2 votes)
IMG_2332a.jpg
View from the PatioLooking into the Condo from the patio.dozer00000
(1 votes)
IMG_1342a.jpg
Removal of old TilesThe old tile was removed.dozer00000
(1 votes)
IMG_9601.jpg
Lanko K10 waterproofingAny roof not dry teched will need a waterproofing treatment at the ridges even after any visible imperfections are caulked. This house used this product over every section of ridge joint. dozer00000
(1 votes)
IMG_8847.jpg
Hip Roof StructureThe raw hip roof structure. The key members are the 3.2 mm thick steel with intermediate sections done in the 2.0 mm thick steel. Box sections are used throughout, no C sections. dozer00000
(1 votes)
DSC03291.jpg
Front ViewThe driveway is large enough for any size pickup. Note on the front perimeter wall there are openings with lights on the top. The wall is done in a natural 'no paint' pigment finish.dozer00000
(1 votes)
IMG_4213.jpg
Switch Box + Power PointThe switch boxes are 50 centimeters from the ground and the switch boxes are 120 centimeters from the ground. The conduit is affixed to the boxes with plastic nuts which hold it in place. dozer00000
(1 votes)
IMG_4683.jpg
Initial Formwork for the Lid PourThis shows the initial formwork for the lid pour. The plywood is supported by 2" x 3" form work below. After the pour the form work will be removed.dozer00000
(1 votes)
IMG_4035.JPG
Hip Roof Structure showing TrussAnother shot of the hip roof structure from outside. There are 1 x 1" pieces of metal at 31 cm. apart on the top to carry the tiles. The M truss is visible on the inside. The truss will not be supported within the structure.dozer00000
(1 votes)
IMG_4001.JPG
Heavy Metal Box ConstructionThe metal used in the critical elements of the roof structure is 4" x 2" box section which is 3.2 mm thick of the heaviest grade of metal (heavy duty).
dozer00000
(1 votes)
IMG_3965.JPG
20 cm. Thick LintelThis shows a finished 20 cm. lintel above the glass blocks.
dozer00000
(1 votes)
IMG_3744.JPG
Poured FoundationThe poured foundation - which includes the outside ground beam (plus interior ground beams) and the poured floor surface. The floor was poured on top of the ground beam, so the level of the foundation increased by appx. 7 cm during the pour. Notice the plumbing in the bathroom and the vertical rebar each 40 centimeters.
dozer00000
(1 votes)
7141 files on 596 page(s) 26

Debug Info 
Debug Output: show / hide