happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSC01088.jpg
To prepare for the pour metal rebar (gauge 2 hun) is hand tied into a mesh pattern. (20-Apr-04)dozer00000
(0 votes)
DSC01087.jpg
Pour in progress in the front bedroom.dozer00000
(0 votes)
DSC00101.jpg
This shows most of the foundation columns as well as the partially finished roof truss. (13-Mar-04)dozer00000
(0 votes)
DSC00094.jpg
The wire being snipped in place. dozer00000
(0 votes)
DSC00093.jpg
The cross supports are held in place by wire strands. dozer00000
(0 votes)
DSC00092.jpg
The metal substructure which uses 4 hun full guage steel with 3 hun full cross supports. There is additionally another strand placed in the middle of the pour (4 hun full). dozer00000
(0 votes)
DSC00091~0.jpg
The size of the footing of the house depends on many factors. For this house 20 inches is used. (05-Mar-04)dozer00000
(0 votes)
DSC00078.jpg
5 people looking at 1 person working. dozer00000
(0 votes)
DSC00075~0.jpg
The cement is poured to anchor the base in place. The depth of this pour is around 20 cm. After this there will be a pour up to ground level which is 60 centimeters wide. Form wood is used as support for this pour.dozer00000
(0 votes)
DSC00074.jpg
The foundation post holes are 1 meter square and 1 meter deep. For this house there are 15 foundation posts.dozer00000
(0 votes)
DSC00073.jpg
The vertical supporting rebar structure has be wired on. The height of the structure depends on the roof height of the house. For this house the posts are 3.5 meters tall (above ground) for an overall height of 4.5 meters.dozer00000
(0 votes)
DSC00072.jpg
The base rebar (4 hun full) is placed on top of a gravel sub footing. The stick represents the middle of the foundation post which is to be poured. dozer00000
(0 votes)
7141 files on 596 page(s) 259