|
Top rated |
Bathroom window framed. Notice the cement base below the window and the use of red brick above.dozer (0 votes)
|
|
Bathroom door being framed. This was a repair job. dozer (0 votes)
|
|
These window frames show the how a cement base is placed above and below the window frame, and how the red bricks are used to level out the wall above the window. (28-Mar-04)dozer (0 votes)
|
|
Starting to frame a bedroom door. A piece of 2 * 4 is used to keep the door in place.dozer (0 votes)
|
|
Front door of house framed. There is a cement base above the door frame. (22-Mar-04)dozer (0 votes)
|
|
Two windows framed. There is a 'leveled' cement base below the window frame and bricks are being used to level the wall to be even with the top of the frame. (13-Mar-04)dozer (0 votes)
|
|
Finished roof, view from rear.dozer (0 votes)
|
|
Finished roof, view from right front.dozer (0 votes)
|
|
Finished roof, view from right front.dozer (0 votes)
|
|
This is the final fix to the valley on the right side of the house. Added flashing material is being added. (30-Jun-04)dozer (0 votes)
|
|
For comparisons sake, a pair of photos of another house, which shows a wide strip of aluminum flashing (about 1 meter wide) being used which is a better way to do the roof flashing. (15-May-04/09-May-04)dozer (0 votes)
|
|
Patio roof section along in foreground. (10-May-04)dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
252 | |
|
|
|
|
|
|
|