DSC03017.jpg
The house as it looks today. (19-May-04)dozer00000
(0 votes)
DSC02149.jpg
This shot shows a piece of tile being laid in. A straight line is used as a guide. Also the line is used to evaluate the level of the tile (so that any unevenness in the floor is taken care of). (14-May-04)dozer00000
(0 votes)
DSC02137.jpg
This shot shows how the kitchen cabinets were formed. First off the counter is poured cement with a wire mesh cross support. This cross support is anchored in the wall. Then bricks are laid and finally the doors are placed. The doors are anchored into place with nails affixed to the side of the frame. (14-May-04)dozer00000
(0 votes)
DSC02109.jpg
This shows the sheetrock roof in the main house area with prep holes for the down lights. (12-May-04)dozer00000
(0 votes)
DSC02039.jpg
The repaired roof valley. This was kind of a struggle due to inadequate valley aluminum which was then compensated for by using two pieces which are welded together. In any event the valley now looks good and there is no problem with water leakage. (02-May-04)dozer00000
(0 votes)
DSC01150.jpg
This shot shows the front facia board which can be made of either wood or synthetic. We are using synthetic version which is formed from cement. Also note the wood framing is being put in place to attach the outdoor roofing material (grc sheeting). (25-Apr-04)dozer00000
(0 votes)
DSC01131.jpg
For each bathroom there are 2 septic tanks, dirty water and solid waste. Standard depth is 4 cement drainage rings, we use 5 which is better. This shot shows the solid waste septic on the left (servicing the small bathroom). The PVC which runs from the toilet is 4" in diameter. (22-Apr-04)dozer00000
(0 votes)
DSC01056.jpg
Stucco is what gives strength to the wall. Notice the thickness of the stucco shown here. This is the front exterior wall. (17-Apr-04)dozer00000
(0 votes)
DSC00152.jpg
This shows the rear door being framed. This is a repair job, since on the first attempt anchor nails were not used. This time nails will be placed at 4" intervals to anchor the door in place. (02-Apr-04)dozer00000
(0 votes)
DSC00108.jpg
Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozer00000
(0 votes)
DSC00107.jpg
Here the roof is partially tiled. The left shot shows the parking lot and patio. The right shot shows the main roof sections. Notice the aluminum drainage sheeting shown in the valley of the right hand picture: it is not really sufficient and will need to be supplemented later. (22-Mar-04)dozer00000
(0 votes)
DSC00100.jpg
The roof structure is built using heavy guage steel. The bigger pieces are 4 *2 inches and 1.6 mm thick. The smaller pieces are 1 by 1 inch and 1.6 mm thick. The roof tile will lie on the 1 by 1's, so they must be placed at the proper interval. Notice the cross beam supports which sit on top of the foundation posts. (13-Mar-04)dozer00000
(0 votes)