Top rated |
Partial wall tile completed. dozer (0 votes)
|
|
The kitchen tile expert selecting tiles. (24-May-04)dozer (0 votes)
|
|
A bit of repair in process. The tile on the front of the cabinet was not even with the door, so the tiles are being removed. More cement will be added to adjust the level. (21-May-04)dozer (0 votes)
|
|
The cement surface of the cabinets is rough finished to allow the tiles to affix easily. dozer (0 votes)
|
|
This shows the opening formed for the exhaust fan. The opening is framed made from a wood frame cemented in place in the wall. The fan fits in place and can be slid out for cleaning. (18-May-04)dozer (0 votes)
|
|
This shows the rough finish on the stucco and the tiles being applied. Cement unmixed with sand is used as the affixing agent. (15-May-04)dozer (0 votes)
|
|
This shows a relatively think layer of stucco is applied.dozer (0 votes)
|
|
Here stucco has been affixed.dozer (0 votes)
|
|
Each cabinet section has a wood door. dozer (0 votes)
|
|
A counter section after the red brick enclosure is complete. (14-May-04)dozer (0 votes)
|
|
Nails are used on the outside of the cabinet to anchor to the surrounding wall. dozer (0 votes)
|
|
Metal rebar (2 hun) is used in forming the brick column supports to add strength. A hole is drilled in the wall and the metal inserted.dozer (0 votes)
|
|