|
Top rated |
Here is a cement ring is being put in place in one of the septics. (23-Apr-04)dozer (0 votes)
|
|
The row of septics is dug behind the house. There are two groups of pairs of septics. From this side the sequence would be toilet, water runoff, water runoff, toilet. dozer (0 votes)
|
|
This shows the toilet septic for the small bathroom. In all there are 4 septic tanks, 2 for water runoff and 2 for toilets. There are 5 cement rings used for each one, the standard being 4. Each ring is 1.2 meters in diameter.dozer (0 votes)
|
|
A septic being dug. (22-Apr-04)dozer (0 votes)
|
|
The small bathroom with 4" PVC for the toilet.dozer (0 votes)
|
|
The framed small bathroom. (13-Mar-04)dozer (0 votes)
|
|
The wall exhaust fan looks like this. It is wired to a separate switch on the right hand side of the sink. (24-Aug-04)dozer (0 votes)
|
|
Finished cabinet section. The cabinet doors have been varnished with three coats of good quality wood varnish.dozer (0 votes)
|
|
Finished cabinet section with stainless sink installed. (06-Jul-04)dozer (0 votes)
|
|
Affixing grout to the tiles on the inside of the cabinets. (19-Jun-04)dozer (0 votes)
|
|
Affixing grout to the kitchen floor tiles. (27-May-04)dozer (0 votes)
|
|
Floor tiles. (26-May-04)dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
237 | |
|
|
|
|
|
|
|