|
Top rated |
The bathtub will be supported by this brick enclosure.dozer (0 votes)
|
|
The large bathroom cabinet. dozer (0 votes)
|
|
The 75 liter hot water heater which is mounted on the kitchen wall. This feeds hot water throughout the house.dozer (0 votes)
|
|
Cabinet in progress in the large bathroom. (21-Jun-04)dozer (0 votes)
|
|
The sink cabinet being formed in the small bathroom. The cabinet is made from bricks. Note the metal on the right which is used to add strength. Holes are drilled in the wall and the metal is inserted prior to the final cement being laid on top.dozer (0 votes)
|
|
Completed and tiled shower enclosure base. (20-Jun-04)dozer (0 votes)
|
|
This shows the base for the shower enclosure in the small bathroom. Tile is being applied. (19-Jun-04)dozer (0 votes)
|
|
The plumber is applying tile grout. (14-Jun-04)dozer (0 votes)
|
|
Large bathroom after tiling is almost complete. The water runoff drain is on the far left (near the bathtub area). The bathtub still needs to be plumbed in. (12-Jun-04)dozer (0 votes)
|
|
Concrete walkway in the rear being finished off, showing two septic exhausts. Note also the metal brackets on the wall which are used as a support for the water heater which is a wall mount and resides in the kitchen.dozer (0 votes)
|
|
Concrete is poured over the hot and cold water pipes. Also note the septic exhaust. (07-Jun-04)dozer (0 votes)
|
|
Large bathroom after cement has just been poured. (05-Jun-04)dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
235 | |
|
|
|
|
|
|
|