|
Top rated |
Prep work for the septic exhaust cover. (08-Jul-04dozer (0 votes)
|
|
Large bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozer (0 votes)
|
|
Large bathroom bathtub and toilet.dozer (0 votes)
|
|
Small bathroom sink.dozer (0 votes)
|
|
Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozer (0 votes)
|
|
Bathtub tiled in. (27-Jun-04)dozer (0 votes)
|
|
Bathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozer (0 votes)
|
|
Heavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozer (0 votes)
|
|
This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozer (0 votes)
|
|
The plumber finishing off the shower enclosure.dozer (0 votes)
|
|
The top shows the heavy duty bathtub drain assembly which was purchased separately for about 1700 Baht. On lower portion shows the default drain assembly which comes with the bathtub. You wouldn't want to use this plastic type. (23-Jun-04)dozer (0 votes)
|
|
Partially tiled sink enclosure in the small bathroom. (22-Jun-04)dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
234 | |
|
|
|
|
|
|
|