|
| Top rated |

5 Minutes Saved, the Story of DIRTY WATER!: The well was dug in February, and although I don't have any pictures it was hand dug by an experienced well digger. This shot shows a well digger descending into a hand dug well. The well in our case is about 7 meters deep and uses 23 rings. (09-Apr-04)dozer     (0 votes)
|
|

Painted and finished wall section with decorative metal. (15-Aug-04)dozer     (0 votes)
|
|

Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer     (0 votes)
|
|

Finishing touches applied to the top of the perimeter wall foundation post.dozer     (0 votes)
|
|

Stucco being applied to the perimeter wall.dozer     (0 votes)
|
|

Laying a brick in place.dozer     (0 votes)
|
|

To apply decorative tiles around a perimeter wall foundation post, the brick layer creates a rig which sits on top of the post and has 'straight-line' nylon line running down the side. (28-Jun-04)dozer     (0 votes)
|
|

A wall section (front and side) with completed support post structures. dozer     (0 votes)
|
|

The support post is poured around the adjacent blocks using a form structure. dozer     (0 votes)
|
|

Another view of the back wall. dozer     (0 votes)
|
|

This is the entry way for the walk in gate. dozer     (0 votes)
|
|

Another shot of the blocks. Note, there is a vertical piece of rebar put in place between the blocks close to the post for every block. This metal piece is used to add strength. It is guage 2 hun full and is about 40 cm long.dozer     (0 votes)
|
|
| 7142 files on 596 page(s) |
 |
 |
 |
 |
 |
230 |  |
 |
 |
 |
|

|
|
|