happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSC05121~0.jpg
The rear gutter and down spout.(13-Aug-04)dozer00000
(0 votes)
DSC05080.jpg
Added the final gutter on top of the patio. (19-Jul-04)dozer00000
(0 votes)
DSC05042.jpg
Interconnected gutters. (09-Jul-04)dozer00000
(0 votes)
DSC05037~0.jpg
Brackets.dozer00000
(0 votes)
DSC05036.jpg
A completed gutter section.dozer00000
(0 votes)
DSC05029.jpg
Installing brackets for the 6" gutter sections. (08-Jul-04)dozer00000
(0 votes)
DSC05151~0.jpg
View of planter boxes from patio. (22-Aug-04)dozer00000
(0 votes)
DSC05041.jpg
Nearly completed planter box on the front right of the patio.dozer00000
(0 votes)
DSC05040.jpg
The planter box which runs adjacent to the driveway. Notice the decorative cement finishing trim added on top. (09-Jul-04)dozer00000
(0 votes)
DSC05030.jpg
Laying a row of bricks. (08-Jul-04)dozer00000
(0 votes)
DSC05028.jpg
Support metal to be fitted in the cement. (07-Jul-04)dozer00000
(0 votes)
DSC04109.jpg
The row of bricks is attached to the wall with strips of rebar for strength. (24-Jun-04)dozer00000
(0 votes)
7142 files on 596 page(s) 226

Debug Info 
Debug Output: show / hide