Each tile is carefully tapped into place. (14-May-04)dozer (0 votes)
|
|
Here is the front bedroom partially tiled. dozer (0 votes)
|
|
This shows a 'straight line' of clear nylon line which is used to make sure the rows are laid straight and also to make sure the tops of the tile are flat and at the proper level. dozer (0 votes)
|
|
Here a tile is being set in place.dozer (0 votes)
|
|
After the floor is poured a level layer of cement is leveled in a row and tiles are placed on top of it and tapped into place. (13-May-04)dozer (0 votes)
|
|
The traces of underlying blocks will show until the cement dries. Before painting is a good time to examine the surface for cracks. (25-Apr-04)dozer (0 votes)
|
|
The foundation posts are finished off by having decorative corners added. (19-Apr-04)dozer (0 votes)
|
|
Stucco applied to the front of the house. (19-Apr-04)dozer (0 votes)
|
|
The stucco coat is thick as seen here, at least 1 centimeter thick. (17-Apr-04)dozer (0 votes)
|
|
Stucco being applied to the rear of the house. (09-Apr-04)dozer (0 votes)
|
|
The stucco is applied in coats. This is a rough coat. (02-Apr-04)dozer (0 votes)
|
|
The stucco being smoothed in the finishing coat.dozer (0 votes)
|
|