happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSC01041~0.jpg
Once the wells starts getting deep the digger will descent using a rope. (09-Apr-04)dozer00000
(0 votes)
DSC01003.jpg
Deep Water Well: A rig at work drilling a deep water well. (03-Apr-04)dozer00000
(0 votes)
DSC05122~0.jpg
Painted and finished wall section with decorative security metal. (15-Aug-04)dozer00000
(0 votes)
DSC05088.jpg
Another thing worth noting. If cheap paint is used on wall sections it will not last long. This section was just painted a few weeks before. (25-Jul-04) dozer00000
(0 votes)
DSC05065.jpg
A close up showing that the post was poured before the blocks were laid in, not after.dozer00000
(0 votes)
DSC05064.jpg
You can see from a close examination of this wall section that the post was not correctly poured around the blocks. (14-Jul-04) dozer00000
(0 votes)
DSC05022.jpg
WALL EXAMINATION: A good enough looking wall section but can you notice two things? The posts are far apart (3.5 meters) and the fact that you can see the imprint of the underlying blocks indicates that the stucco layer applied was very thin. (06-Jul-04)dozer00000
(0 votes)
DSC05018~0.jpg
Finished wall section with some decorative brickwork on the entry posts. (06-Jul-04)dozer00000
(0 votes)
DSC05004.jpg
This application was finished off with two main entry posts and an entry gate. A layer of bricks was used on top of these prefabricated entry posts for an artistic look. (06-Jul-04).dozer00000
(0 votes)
DSC04143~0.jpg
Finishing touches applied to the top of the perimeter wall foundation post.dozer00000
(0 votes)
DSC04142~0.jpg
Stucco being applied to the perimeter wall.dozer00000
(0 votes)
DSC04140~0.jpg
Laying a brick in place.dozer00000
(0 votes)
7141 files on 596 page(s) 203

Debug Info 
Debug Output: show / hide