|
Top rated |
Apply Interior PaintHigh quality gloss paint.dozer (1 votes)
|
|
Laying Synthetic Wood FlooringThe synthetic wood flooring is laid over a rubberized underlayment.dozer (1 votes)
|
|
DrainageBefore being cemented into place it rained, and we enjoyed seeing that the drainage in use. Min. 3" PVC is used for drainage.dozer (1 votes)
|
|
Wood windows in front of house.dozer (1 votes)
|
|
This shot is from the neighbor's development (since I missed the foundation column pour), but this gives you an idea of how the foundation columns are poured. Form wood is wedged in place over the square upright rebar frames and then the concrete is poured in. The foundation columns should have a width of about 20 centimeters square. (24-Apr-04)dozer (1 votes)
|
|
Power Point OpeningAn opening for a 4 receptacle power point in a designated empty hole within the load bearing wall.
dozer (1 votes)
|
|
Top of Tank FinishingHere the concrete is being poured and finished on top of the tank. It is thick enough to support a motorcycle + car. dozer (1 votes)
|
|
ShowerThe shower, which will be in the corner, has hot and cold piping, the reddish pipe is for hot water.dozer (1 votes)
|
|
Visual Roof InspectionAs long as there is none of the foil insulation which adheres to, and is installed at the same time the cement tiles are installed, the roof can be inspected visually during rain storms for leaks. If the foil has been applied any roof leaks will be much harder to find and repair. dozer (1 votes)
|
|
Render BrushThe brush is used during the render application to sprinkle water on the render as it is starting to dry, then it is polished with a cement trowel.dozer (1 votes)
|
|
CPAC Pour of Ground BeamsCPAC ready mix cement pour of ground beams. 280 KSC (kilometers per square centimeter) concrete was used as in the floor. CPAC is better than hand mix for large areas since it is poured as a homogeneous unit.
dozer (1 votes)
|
|
Footing HoleA footing hole with metal frame work. Each hole was 1 meter square by about 40 cm. deep. In this design there are only two foundation columns in the patio. Throughout the rest of the house there are footing and then a ground beam on top of the footings. The walls are load bearing with columns inside the wall material itself.
dozer (1 votes)
|
|
7141 files on 596 page(s) |
2 | |
|
|
|
|
|
|
|
|
|
|
|
|