happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Top rated
DSC02269.JPG
Fill Dirt after PostsThis build used 4 meter tall prefabricated columns. They were set in footings and allowed to dry for 1 week, then fill dirt was brought in to raise the floor level. dozer00000
(0 votes)
20060911042.jpg
Small worker checks out the progress. dozer00000
(0 votes)
20060911038.jpg
Interior wall with electric sunken electric junction box. One row above the box there is a poured ring beam to add strength. dozer00000
(0 votes)
DSC05125~2.jpg
The front gutter system. (15-Aug-04)dozer00000
(0 votes)
DSC05121~1.jpg
The rear gutter and down spout.(13-Aug-04)dozer00000
(0 votes)
DSC05080~0.jpg
Added the final gutter on top of the patio. (23-Jun-04)dozer00000
(0 votes)
DSC05042~0.jpg
Interconnected gutters. (19-Jun-04)dozer00000
(0 votes)
DSC05037~2.jpg
Brackets.dozer00000
(0 votes)
DSC05036~0.jpg
A completed gutter section. (18-Jun-04)dozer00000
(0 votes)
DSC05029~0.jpg
Installing brackets for the 6" gutter sections. (16-Jun-04)dozer00000
(0 votes)
DSC05151~1.jpg
View of planter boxes from patio. (22-Aug-04)dozer00000
(0 votes)
DSC05115~0.jpg
The resulting paving stone walkway. (12-Aug-04)dozer00000
(0 votes)
7142 files on 596 page(s) 198