|
Top rated |
Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer (0 votes)
|
|
Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer (0 votes)
|
|
Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer (0 votes)
|
|
Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer (0 votes)
|
|
The footing for the bathroom. The ground beam will be on top of this.dozer (0 votes)
|
|
The external bathroom footing with the rebar footing pad in place. dozer (0 votes)
|
|
Side view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer (0 votes)
|
|
Approximate wall thickness after rendering, about 8 cm. dozer (0 votes)
|
|
|
The interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer (0 votes)
|
|
After the exterior walls have been rendered. dozer (0 votes)
|
|
The exterior prior to rendering the surface. dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
196 | |
|
|
|
|
|
|
|