Electric to Extrude through ColumnsThe level of the original electric will be raised since the columns is being extended upwards.dozer (0 votes)
|
|
Ribs being Attached to FrameThe lateral support members are wired in place each 20 centimeters. dozer (0 votes)
|
|
|
Form Work and Rebar FrameThe form work is in place for the upper beam to be poured. The rebar frame for the beam is seem on the road. dozer (0 votes)
|
|
ScrapThe part cut off, to be sold for scrap.dozer (0 votes)
|
|
Metal ToppedThe top of the metal was cut off, here it is being smoothed. dozer (0 votes)
|
|
Original Wall with MetalAnother view of the original wall that will be raised. The metal will be topped and a new beam poured on top. dozer (0 votes)
|
|
Original View of Front WallThis is an original view of the front wall. To note the road had just been re-bulldozed, the lower total height of the wall is 75 cm and the top of the metal is at about 1.6 m. dozer (0 votes)
|
|
Prep WorkThe top concrete layer had already been removed, here is some of the dirt dug in prep for pouring concrete. Forms are starting to be positioned. dozer (0 votes)
|
|
Original WellThe stone aggregate (used to line the line the well) footprint was eventually concreted over. dozer (0 votes)
|
|
Troweling the SurfaceThe finished surface of the upper level of the pour with concrete all around the well. dozer (0 votes)
|
|
Forming Sealing LayerThe forms and rebar are set in place to pour the upper level of concrete. The gutter is poured separately. dozer (0 votes)
|
|