|
Top rated |
Height of TileThe red chalk line is established by measuring down from the level line.dozer (0 votes)
|
|
Tile: Level LineA level line is being determined for laying the tile. dozer (0 votes)
|
|
Prepping to PrimerGetting the wall ready to primer. The upper trim is kept, caulking is being applied to the between the concrete ceiling and the trim. Wall paper is being scrapped off. dozer (0 votes)
|
|
Old Carpet and PaddingThe old rotted out carpet and padding pulled back in an area with some water damage.dozer (0 votes)
|
|
Wall PaperThe wall paper starting to peel in an area where there was some water damage.dozer (0 votes)
|
|
Scrap A/CScrap A/C unit sits on old blue carpet.dozer (0 votes)
|
|
Shower Curtain and TubThe shower curtain and tub, covered in old dust and grime. dozer (0 votes)
|
|
BathroomThe bathroom was dirty but otherwise in OK condition, considering. We left the bathroom as is with just some clean up and a new water heater.dozer (0 votes)
|
|
Wall PaperThere was ugly wall paper on the wall and blue carpet on the floor, along with a bunch of really old furniture. The carpet had some water damage and the wall paper was peeling off the wall. dozer (0 votes)
|
|
Before Unoccupied CondoThis condo had not been occupied in several years and was as originally built except that everything in the condo had deteriorated.dozer (0 votes)
|
|
Carpet in Master BedroomThis carpet before removal.dozer (0 votes)
|
|
Guest BedroomGuest bedroom with new flooring.dozer (0 votes)
|
|
7141 files on 596 page(s) |
|
|
|
|
|
185 | |
|
|
|
|
|
|
|